Building Tracks – April 27

MIXED USE and NON-RESIDENTIAL

Claimant: Sovereign Centros on behalf of St Enoch Trustee Company Ltd

Planning Authority: Glasgow

Details: Phased demolition of the existing St Enoch Shopping Center with redevelopment and renovation of the demolition site and surrounding land/buildings, including the construction of a phased mixed-use development comprising retail (Class 1), services financial and professional premises (Class 2), restaurants (Class 3), public house (sui generis), offices and commercial premises (Class 4), hotel, apart-hotel and hostel (Class 7 and sui generis), serviced apartments ( sui generis), residential apartments (sui generis), residential institution (class 8), non-residential institutions (class 10), meeting and leisure (class 11), public realm (including outdoor performance space), landscaping, parking, modifications to the public road network, servicing and access arrangements and associated works



Location: St Enoch Shopping Center 1 St Enoch Center Glasgow

Agent: Iceni Projects Gary Mappin 177 West George Street Glasgow

Reference: 22/00817/PPP

Application Link



RESIDENTIAL – TEN UNITS OR MORE

Applicant: New Gorbals Housing Association Ltd

Planning Authority: Glasgow



Details: Construction of a residential development (28 units) with parking, landscaping and associated urban development works.

Location: Gorbals Health Center 45 Pine Place Glasgow

Agent: Reiach And Hall Architects Per Claire Milnes 8 Darnaway Street Edinburgh

Reference: 22/00861/FUL



Application Link

Claimant: BDW Trading Ltd

Planning Authority: Glasgow



Details: Construction of a residential development (49 units) with associated landscaping, open space, access, parking and infrastructure

Location: Site at Robroyston Road/Railway Line/ Robroyston Drive Glasgow

Agent: Savills (UK) Ltd Adam Richardson 8 Wemyss Place Edinburgh

Reference: 22/00846/FUL

Application Link

TENDER

Contracting Authority: Aberdeen City Council

Details: Work includes removal of existing glazed entrance screen and existing ramp; installation of a new glazed entrance screen incorporating an accessible door; installation of a ramp and accessible steps; flooring and redecoration of affected areas are also included.

Location: Dyce

Contact: [email protected]gov.uk

Publication date: 04/26/2022

Comments are closed.